Ques:- What is mcArther pile?
Asked In :- saudi aramco,
Right Answer:
A McArthur pile is a type of deep foundation used in construction, characterized by its cylindrical shape and typically made of reinforced concrete. It is designed to transfer loads from structures to deeper, more stable soil layers.
Ques:- How to calculate sand,cement for 1:5ratio brick masonary
Asked In :- Cadent Gas, nexperia,
Right Answer:
To calculate the quantities of sand and cement for a 1:5 ratio brick masonry, follow these steps:

1. Determine the total volume of the mortar needed (in cubic meters or cubic feet).
2. For a 1:5 mix, the total parts = 1 (cement) + 5 (sand) = 6 parts.
3. Calculate the volume of cement: (Total volume of mortar) × (1/6).
4. Calculate the volume of sand: (Total volume of mortar) × (5/6).

For example, if you need 1 cubic meter of mortar:
- Cement = 1/6 × 1 = 0.167 m³
- Sand = 5/6 × 1 = 0.833 m³

Convert these volumes to weight if needed (Cement: approx. 1440 kg/m³, Sand: approx. 1600 kg/m³).
Ques:- Calculate qty of sand in 15 mm plaster for 100 sqm.
Right Answer:
To calculate the quantity of sand required for 15 mm plaster for 100 sqm, you need to consider the volume of plaster.

1. Thickness of plaster = 15 mm = 0.015 m
2. Area = 100 sqm

Volume of plaster = Area × Thickness = 100 sqm × 0.015 m = 1.5 cubic meters.

Assuming the mix ratio for plaster is 1:4 (cement:sand), the total parts = 1 + 4 = 5.

Quantity of sand = (4/5) × Volume of plaster = (4/5) × 1.5 m³ = 1.2 m³.

So, the quantity of sand required is **1.2 cubic meters**.
Ques:- How to calculate no. of earthing pits and their diamensions?no. of lightning arrester rods which are required to protect a building of 35 mtr and we calculate?
Right Answer:
To calculate the number of earthing pits, consider the following:

1. **Earthing Pit Calculation**: Generally, one earthing pit is required for every 1000 m² of building area. The dimensions of each pit should be around 1 m x 1 m x 2.5 m deep.

2. **Lightning Arrester Rod Calculation**: For a building of 35 m height, typically one lightning rod is needed for every 20 m of height. Therefore, you would need at least 2 lightning rods for a 35 m building.

Ensure to consult local codes and standards for specific requirements.
Ques:- REASON FOR CHANGE FROM CURRENT ORGANIZATION?
Asked In :-
Right Answer:
I am seeking new challenges and opportunities for growth that align more closely with my career goals and interests.
Ques:- How much cement,sand,aggregate will use for 1 cum in ratio of 1:2:4.
Asked In :- plug power,
Right Answer:
For a concrete mix ratio of 1:2:4 (Cement:Sand:Aggregate) for 1 cubic meter (cum), you will need:

- Cement: 0.4 cubic meters
- Sand: 0.8 cubic meters
- Aggregate: 1.6 cubic meters
Ques:- What is meant by camber
Asked In :-
Right Answer:
Camber refers to the slight upward curve or slope of a pipeline or road surface, designed to facilitate drainage and improve structural integrity.
Ques:- Residential buildings,mixing ofconcrete,structural,construction material,site handling.
Asked In :- Visa Steel Ltd, metrohm,
Right Answer:
When designing residential buildings, it's important to ensure proper mixing of concrete for structural integrity. Use high-quality construction materials and follow best practices for site handling to ensure safety and efficiency during the construction process.
Ques:- WHAT IS THE CALCULATION FOR FINDING CEMENT AND SAND FOR 10' * 12' AREA RATIO 1:6 THICKNESS 12 MM
Right Answer:
To calculate the amount of cement and sand for a 10' x 12' area with a ratio of 1:6 and a thickness of 12 mm:

1. Convert dimensions to meters:
- Area = 10' x 12' = 3.048 m x 3.658 m = 11.14 m²
- Thickness = 12 mm = 0.012 m

2. Calculate volume:
- Volume = Area x Thickness = 11.14 m² x 0.012 m = 0.13368 m³

3. Total parts in the mix = 1 (cement) + 6 (sand) = 7 parts.

4. Calculate volumes of cement and sand:
- Volume of cement = (1/7) x 0.13368 m³ = 0.0191 m³
- Volume of sand = (6/7) x 0.13368 m³
Ques:- How to find quantity of cement mortar?I want to know the req quantity of cement for plastering 300sft in final coat with 12 mm. Any math involved? Plz help
Right Answer:
To find the quantity of cement mortar required for plastering 300 square feet (sft) with a final coat thickness of 12 mm, follow these steps:

1. Convert the area from square feet to square meters:
[
300 , text{sft} = 300 times 0.092903 = 27.87 , text{m}^2
]

2. Calculate the volume of plaster required:
[
text{Volume} = text{Area} times text{Thickness} = 27.87 , text{m}^2 times 0.012 , text{m} = 0.3344 , text{m}^3
]

3. Assuming a typical mix ratio of 1:4 (cement:sand), the total parts = 1 + 4 = 5.

4. Calculate the volume of cement
Ques:- What is the difference between weir and a barrage
Asked In :-
Right Answer:
A weir is a barrier built across a river to raise the water level upstream, primarily for measuring flow or controlling water levels, while a barrage is a gate-controlled structure that regulates water flow and levels in a river, allowing for more precise management of water resources and irrigation.
Ques:- How to calculate the cement, sand quantity for plastering?(10'x10')10mm thick ratio 1:5. wht”s the formula?
Right Answer:
To calculate the quantities of cement and sand for plastering a 10'x10' area at 10mm thickness with a mix ratio of 1:5, use the following steps:

1. Calculate the volume of plaster:
- Area = 10 ft x 10 ft = 100 sq ft
- Thickness = 10 mm = 0.033 ft (10 mm / 304.8)
- Volume = Area x Thickness = 100 sq ft x 0.033 ft = 3.3 cu ft

2. Calculate the total parts in the mix ratio:
- Total parts = 1 (cement) + 5 (sand) = 6 parts

3. Calculate the volume of cement and sand:
- Volume of cement = (1/6) x 3.3 cu ft = 0.55 cu ft
- Volume of sand = (5/6) x 3.3 cu ft = 2
Ques:- How to calculate concrete quantity for footing using M25 grade 1:1:2 for 730cft.
Asked In :- powerlink queensland,
Right Answer:
To calculate the concrete quantity for footing using M25 grade 1:1:2 for 730 cubic feet (cft):

1. Calculate the total parts in the mix: 1 (cement) + 1 (sand) + 2 (aggregate) = 4 parts.
2. Find the volume of concrete: 730 cft.
3. Calculate the quantity of each material:
- Cement = (1/4) * 730 cft = 182.5 cft
- Sand = (1/4) * 730 cft = 182.5 cft
- Aggregate = (2/4) * 730 cft = 365 cft

So, the quantities are:
- Cement: 182.5 cft
- Sand: 182.5 cft
- Aggregate: 365 cft
Ques:- What is meaning of Automobile?
Asked In :- ontic,
Right Answer:
An automobile is a self-propelled vehicle designed for transporting passengers or goods on roads.
Ques:- How much of experience you have in design?
Asked In :- anglogold ashanti,
Right Answer:
I have [X years] of experience in design, specifically in pipeline design.


A Design Engineer specializing in Pipeline Design is a highly technical and critical professional in sectors such as oil and gas, water distribution, and chemical transport. Their role is to conceptualize, plan, and create the detailed engineering blueprints for pipeline systems that transport liquids, gases, or slurries over short or long distances. Their work is a complex blend of theoretical engineering principles, practical application, and an unwavering commitment to safety and environmental responsibility.

The responsibilities of a Pipeline Design Engineer are comprehensive, spanning the entire project lifecycle. The process begins with the conceptual design, which involves conducting feasibility studies, selecting the optimal route for the pipeline, and determining its size and material specifications. This requires a thorough analysis of geographical data, soil conditions, and environmental impact assessments. Following this, the engineer moves into the detailed engineering phase. This is where they perform a series of complex calculations, including fluid dynamics, pressure and temperature analysis, stress analysis, and thermal expansion. These calculations are crucial for ensuring the pipeline can withstand the forces it will be subjected to over its operational life.

A paramount aspect of the role is ensuring compliance with a myriad of national and international codes, standards, and regulations. The design must be robust enough to prevent leaks, corrosion, or ruptures, which could lead to catastrophic environmental damage or safety hazards. The engineer is also responsible for selecting appropriate materials for the pipes, valves, pumps, and other components, and for creating detailed drawings and specifications using specialized Computer-Aided Design (CAD) software. This is a highly collaborative role, requiring close coordination with civil and structural engineers, project managers, and regulatory bodies. Ultimately, the Pipeline Design Engineer is the lynchpin of a project, transforming a transportation need into a safe, reliable, and functional reality.

AmbitionBox Logo

What makes Takluu valuable for interview preparation?

1 Lakh+
Companies
6 Lakh+
Interview Questions
50K+
Job Profiles
20K+
Users