Find Interview Questions for Top Companies
Ques:- What equipment and machineries required and how are they auired and maintained.
Asked In :- Konkan Railway,
Right Answer:
The equipment and machinery required depend on the specific mechanical processes involved, but generally include tools like lathes, milling machines, drills, and CNC machines. These are acquired through purchase from manufacturers or suppliers, leasing, or renting. Maintenance is performed through regular inspections, servicing, and repairs, often following manufacturer guidelines and schedules to ensure optimal performance and longevity.
Ques:- Best run to control quailty
Asked In :-
Right Answer:
The best run to control quality is to implement a robust Quality Management System (QMS) that includes regular inspections, standardized procedures, continuous training, and feedback loops for continuous improvement.
Ques:- Maual auto matily function
Right Answer:
The manual automatic function refers to a system where a process can be controlled both manually and automatically, allowing operators to switch between manual control for specific tasks and automatic control for efficiency.
Ques:- About production
Right Answer:
Production refers to the process of creating goods or services by combining various resources, such as labor, materials, and equipment, to meet consumer demand. It involves planning, executing, and controlling the production activities to ensure efficiency, quality, and timely delivery.
Ques:- How can you control the power losses
Asked In :-
Ques:- How many min no of bars used in the design of column?
Asked In :- bgc engineering,
Right Answer:
The minimum number of bars used in the design of a column is typically four.
Ques:- Tower and sturcture
Asked In :- ola,
Right Answer:
A tower and structure must be designed to withstand various loads, including dead loads (permanent/static), live loads (temporary/dynamic), wind loads, and seismic loads. Proper material selection, structural analysis, and safety factors are essential to ensure stability, strength, and durability.
Ques:- Structural & EXECUTION
Asked In :- XCMG, etihad rail,
Right Answer:
The question seems incomplete or unclear. Please provide more context or specify the exact question regarding "Structural & EXECUTION."
Ques:- How will you identify Electrical Supply in an aircraft? What electric supply is avaiable in an aircraft? How does an induction motor works? Differentiate between spark plug and ignitor plug?
Asked In :- mec,
Ques:- Execution of HT / LT Panels
Asked In :- sse plc,
Ques:- Construction of hydro electric power project as per drawing and specification.
Asked In :- Trane Technologies,
Right Answer:
The construction of a hydroelectric power project involves the following key steps:

1. **Site Selection**: Choose a suitable location with adequate water flow and elevation.
2. **Design and Planning**: Create detailed designs and specifications for the dam, turbine, and other infrastructure.
3. **Environmental Assessment**: Conduct studies to evaluate the environmental impact and obtain necessary permits.
4. **Civil Works**: Construct the dam, spillway, intake structure, and power house according to the specifications.
5. **Installation of Equipment**: Install turbines, generators, and electrical systems.
6. **Water Management**: Ensure proper water flow management for optimal energy production.
7. **Testing and Commissioning**: Test all systems and ensure they meet safety and performance standards before going operational.
8. **Maintenance Plan**: Establish a plan for ongoing maintenance and monitoring of the facility.


AmbitionBox Logo

What makes Takluu valuable for interview preparation?

1 Lakh+
Companies
6 Lakh+
Interview Questions
50K+
Job Profiles
20K+
Users