Ques:- How many types of bearing are there?
Right Answer:
There are several types of bearings, including:

1. Ball Bearings
2. Roller Bearings
3. Needle Bearings
4. Thrust Bearings
5. Magnetic Bearings
6. Fluid Bearings
7. Sleeve Bearings (or Plain Bearings)
Ques:- HOW TO FIND THE PRIMARY AND SECONDARY OF TRANSFORMER(IN OFF CONDITION) USING MULTIMETER? IS IT POSSIBLE FIND BY SEEING RESISTANCE???
Asked In :-
Ques:- How is increase production quantity and quality.
Right Answer:
To increase production quantity and quality, implement the following strategies:

1. **Optimize Processes**: Streamline workflows and eliminate bottlenecks.
2. **Invest in Training**: Enhance employee skills and knowledge.
3. **Use Technology**: Adopt automation and advanced tools for efficiency.
4. **Quality Control**: Implement strict quality assurance measures.
5. **Monitor Performance**: Use metrics to track production and identify areas for improvement.
6. **Engage Employees**: Foster a culture of continuous improvement and feedback.
Ques:- How to calculate concrete quantity for footing using M25 grade 1:1:2 for 730cft.
Asked In :- powerlink queensland,
Right Answer:
To calculate the concrete quantity for footing using M25 grade 1:1:2 for 730 cubic feet (cft):

1. Calculate the total parts in the mix: 1 (cement) + 1 (sand) + 2 (aggregate) = 4 parts.
2. Find the volume of concrete: 730 cft.
3. Calculate the quantity of each material:
- Cement = (1/4) * 730 cft = 182.5 cft
- Sand = (1/4) * 730 cft = 182.5 cft
- Aggregate = (2/4) * 730 cft = 365 cft

So, the quantities are:
- Cement: 182.5 cft
- Sand: 182.5 cft
- Aggregate: 365 cft
Ques:- What is the difference between diode and a electrode?
Asked In :-
Right Answer:
A diode is a semiconductor device that allows current to flow in one direction only, while an electrode is a conductor through which electricity enters or leaves an electrochemical cell or device.
Ques:- How the entire process is carried out in a power plant?
Right Answer:
In a power plant, the process typically involves the following steps:

1. **Fuel Supply**: Fuel (like coal, natural gas, or nuclear material) is delivered to the plant.
2. **Combustion/Reaction**: The fuel is burned or undergoes a nuclear reaction to produce heat.
3. **Heat Transfer**: The heat generated is used to convert water into steam in a boiler or reactor.
4. **Steam Generation**: The high-pressure steam is produced and directed to a turbine.
5. **Turbine Operation**: The steam drives the turbine blades, converting thermal energy into mechanical energy.
6. **Electricity Generation**: The turbine is connected to a generator, which converts mechanical energy into electrical energy.
7. **Cooling System**: After passing through the turbine, the steam is cooled and condensed back into water in a condenser.
8. **Water Recirculation**: The condensed water is pumped back to the boiler or reactor to repeat
Ques:- Asked about my experience and what are my duties and responsibilities?
Asked In :- aurecon, worley,
Ques:- How can you manage the man power during peak loads?
Asked In :-
Right Answer:
To manage manpower during peak loads, I would implement the following strategies:

1. **Forecast Demand**: Analyze historical data to predict peak periods.
2. **Flexible Staffing**: Hire temporary or part-time workers to handle increased workload.
3. **Cross-Training**: Train employees in multiple roles to ensure versatility.
4. **Prioritize Tasks**: Focus on critical tasks and delegate effectively.
5. **Optimize Processes**: Streamline operations to improve efficiency.
6. **Monitor Performance**: Use real-time data to adjust staffing as needed.
7. **Communicate Clearly**: Keep the team informed about expectations and changes.
Ques:- HOW TO CALIBRATE LEVEL TROLL AND HOW TO CONNECT?
Right Answer:
To calibrate a level troll, follow these steps:

1. **Preparation**: Ensure the level troll is installed correctly in the piping system and is powered on.

2. **Zero Calibration**: Fill the tank or vessel to the lowest level (zero point). Adjust the zero setting on the level troll to match the actual level reading.

3. **Span Calibration**: Fill the tank to the highest level (span point). Adjust the span setting on the level troll to match the actual level reading.

4. **Verification**: Check the readings at various levels between zero and span to ensure accuracy. Make further adjustments if necessary.

5. **Connection**: Connect the level troll to the control system using the appropriate wiring (usually 4-20 mA or digital signals) as per the manufacturer's instructions.

6. **Testing**: After calibration, test the system to confirm that the level troll is providing accurate readings.

Ensure to follow safety protocols during the calibration process.
Ques:- What is an Inspection and test status?
Right Answer:
Inspection and test status refers to the current condition or progress of inspections and tests conducted on materials, components, or systems in a project. It indicates whether items have passed, failed, or are pending inspection or testing, helping to ensure quality control and compliance with specifications.
Ques:- Details of RMC Batching Slip
Right Answer:
A RMC (Ready Mixed Concrete) Batching Slip is a document that provides details about the concrete mix being delivered. It typically includes information such as the batch number, date and time of batching, type of concrete mix, quantities of materials used (cement, aggregates, water, additives), the total volume of concrete, and the delivery location. This slip ensures that the correct mix is produced and delivered according to specifications.


AmbitionBox Logo

What makes Takluu valuable for interview preparation?

1 Lakh+
Companies
6 Lakh+
Interview Questions
50K+
Job Profiles
20K+
Users