Ques:- How do you debug failing units during ATE testing
Asked In :-
Cummins India, SMC Pneumatics,
Right Answer:
To debug failing units during ATE testing, follow these steps:
1. Review test logs and error messages for clues.
2. Check the test setup and connections for any issues.
3. Isolate the failing unit and run individual tests to identify the fault.
4. Use diagnostic tools to measure signals and verify functionality.
5. Compare results with expected outcomes to pinpoint discrepancies.
6. Inspect the unit for physical defects or component failures.
7. Document findings and repeat tests as necessary to confirm issues.
To debug failing units during ATE testing, follow these steps:
1. Review test logs and error messages for clues.
2. Check the test setup and connections for any issues.
3. Isolate the failing unit and run individual tests to identify the fault.
4. Use diagnostic tools to measure signals and verify functionality.
5. Compare results with expected outcomes to pinpoint discrepancies.
6. Inspect the unit for physical defects or component failures.
7. Document findings and repeat tests as necessary to confirm issues.