Ques:- What is the difference between HMI and Scada?
Right Answer:
HMI (Human-Machine Interface) is a user interface that allows operators to interact with machines or systems, while SCADA (Supervisory Control and Data Acquisition) is a system that monitors and controls industrial processes, often using multiple HMIs to gather data and provide oversight.
Ques:- Plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work(1sqM)?
Asked In :-
Right Answer:
The rates can vary by location and market conditions, but generally, approximate rates are:

- RCC (Reinforced Cement Concrete): ₹5,000 - ₹7,000 per cubic meter
- PCC (Plain Cement Concrete): ₹3,000 - ₹5,000 per cubic meter
- Brick Work: ₹1,000 - ₹2,000 per square meter

Please check local rates for accuracy.
Ques:- Why bent up bars provided in R.C.C slab
Right Answer:
Bent up bars are provided in R.C.C. slabs to effectively resist shear forces and to enhance the overall structural integrity by improving the bond between the concrete and the reinforcement, especially in areas where shear stress is high.
Ques:- Hi can you give any body fault level calculation, generatorfault level calculation,transformer fault level calculationfor system fault level with equation? i have 3.3kvgeneration voltage three gas gen sets, one is 1.9MW,2nd is2.5MW,& 3rd is 3.8MW & i have 11 kv generation voltage onegas gen sets is 3.8MW, we are step up to 22kv by transformer
Right Answer:
To calculate the fault levels for the given system, you can use the following equations:

1. **Generator Fault Level (in MVA)**:
[
text{Fault Level} = frac{S}{sqrt{3} times V}
]
Where ( S ) is the generator capacity in MVA and ( V ) is the voltage in kV.

For each generator:
- 1.9 MW at 3.3 kV:
[
text{Fault Level} = frac{1.9}{sqrt{3} times 3.3} approx 0.33 text{ MVA}
]
- 2.5 MW at 3.3 kV:
[
text{Fault Level} = frac{2.5}{sqrt{3} times 3.3} approx 0.43
Ques:- What is ERW & shedule & seamless pipe? and whas the IBR grade pipe.
Right Answer:
ERW (Electric Resistance Welded) pipe is made by rolling steel sheets and welding them along the seam. Schedule refers to the wall thickness of the pipe, with higher schedule numbers indicating thicker walls. Seamless pipe is manufactured without any joints or welds, providing higher strength and reliability. IBR (Indian Boiler Regulation) grade pipe is a classification of pipes that meet specific standards for use in boiler and pressure applications in India.
Ques:- Why are you interested in oour compnay ?
Asked In :- john crane,
Right Answer:
I am interested in your company because of its strong reputation in the industry, commitment to innovation, and focus on professional development, which aligns with my career goals and values.
Ques:- How much % of fine sand(jamuna sand)we can use with coase sand for making concrete.
Asked In :-
Right Answer:
Typically, you can use up to 30% fine sand (Jamuna sand) with coarse sand for making concrete.
Ques:- WHAT IS THE MASS FLOW FLOW METER
Asked In :- sna,
Right Answer:
A mass flow meter is a device that measures the mass of a fluid flowing through a pipe, providing accurate flow rate readings regardless of changes in temperature or pressure.
Ques:- What are the documents(Construction point of view for a process plant) submitted by contactor initially entering in to new site for client?
Right Answer:
The documents submitted by the contractor initially entering a new site for a client in a process plant include:

1. Project Execution Plan (PEP)
2. Health, Safety, and Environmental (HSE) Plan
3. Quality Assurance/Quality Control (QA/QC) Plan
4. Construction Schedule
5. Method Statements
6. Risk Assessment and Management Plan
7. Material Submittals
8. Personnel Qualifications and Certifications
9. Site Layout Plan
10. Insurance Certificates and Bonds
Ques:- How to calculate the no. of earth pits required for an electrical installation?
Asked In :- Pod Point, KSE Electricals, sdp,
Right Answer:
To calculate the number of earth pits required for an electrical installation, use the following formula:

1. Determine the total earth resistance required (usually ≤ 1 ohm for safety).
2. Measure the resistance of a single earth pit.
3. Use the formula:

Number of earth pits = Total earth resistance required / Resistance of a single earth pit.

Ensure to consider local regulations and soil conditions that may affect the resistance.
Ques:- Any meter avilable for measureing the Transformer Losses. ( like Voltmeter for voltage & ammiter for currenr )if yes plz give the make & supplier address, Email, Phone number.
Right Answer:
Yes, there are meters available for measuring transformer losses, such as the Power Analyzer or Power Quality Analyzer. One example is the Fluke 435 Series II Power Quality and Energy Analyzer.

Supplier: Fluke Corporation
Website: www.fluke.com
Phone: +1 425-446-5500
Email: info@fluke.com
Ques:- What”s the different between OPC (ordinary portland cement) and PPC (pozalana portland cement)?
Asked In :- bgr energy systems,
Right Answer:
Ordinary Portland Cement (OPC) is made primarily from clinker and does not contain any supplementary materials, while Pozzolana Portland Cement (PPC) includes pozzolanic materials like fly ash or volcanic ash, which enhance its properties and durability.
Ques:- HOW MANY ERROR CALCULATIONS ARE THERE USED IN PROCESS INDUSTRIES?
Asked In :- burns & mcdonnell,
Right Answer:
There are generally three types of error calculations used in process industries: absolute error, relative error, and percentage error.
Ques:- Distinguish between Viscous and Turbulent flow?
Right Answer:
Viscous flow is smooth and orderly, with layers of fluid sliding past each other, typically occurring at low velocities and high viscosity. Turbulent flow is chaotic and irregular, with mixing and eddies, usually occurring at high velocities and low viscosity.
Ques:- What is the costing of Muck Material in lifting fromBlasting area.
Right Answer:
The costing of muck material in lifting from the blasting area typically includes factors such as the volume of muck, transportation distance, equipment rental or operation costs, labor costs, and any disposal fees. It is calculated by estimating these costs based on project specifications and local rates.
Ques:- Speak for five minutes about hyderabad
Asked In :- ATS Automation Tooling,
Right Answer:
Hyderabad is a major city in southern India, known for its rich history and culture. It is the capital of the Indian state of Telangana and serves as an important center for technology and business. The city is famous for its historical landmarks, such as the Charminar and Golconda Fort, which reflect its Mughal and Qutb Shahi heritage.

Hyderabad is also known for its cuisine, particularly the iconic Hyderabadi Biryani, which is a flavorful rice dish made with marinated meat and spices. The city has a vibrant arts scene, with traditional dance forms and music, as well as modern cultural events.

In recent years, Hyderabad has emerged as a hub for information technology and biotechnology, attracting numerous multinational companies and startups. The HITEC City area is a prime example of this growth, featuring modern office spaces and infrastructure.

Additionally, Hyderabad is home to several educational institutions and research centers, contributing to its reputation as an academic center. The city has a diverse population
Ques:- What is the job goals life goals
Right Answer:
My job goals include continuously improving my skills in quality assurance and ensuring that all projects meet the highest standards of safety and performance. My life goals involve achieving a healthy work-life balance, contributing positively to my community, and pursuing personal growth through learning and experiences.