Ques:- What is dirac delta function and its fourier transform andits importance?
Right Answer:
The Dirac delta function is a mathematical function that represents an idealized point mass or point charge, characterized by being zero everywhere except at a single point, where it is infinitely high, and integrates to one. Its Fourier transform is a constant function, meaning that it has equal amplitude across all frequencies. The importance of the Dirac delta function lies in its ability to simplify the analysis of systems in physics and engineering, particularly in signal processing and control systems, as it allows for the representation of impulses and point sources.
Ques:- WHAT IS PCCB?
Asked In :-
Right Answer:
PCCB stands for Power Control Circuit Breaker. It is a device used to protect electrical circuits from overloads and short circuits, ensuring safe operation by automatically disconnecting the circuit when a fault is detected.
Ques:- How must steel will use for 1 cubic meter.formula of steel for beam,column,lantern.
Asked In :- Bobst India, L&T Valves, ola,
Right Answer:
To estimate the amount of steel required for 1 cubic meter of concrete, you can use the following approximate formulas:

1. **For Beams**: 1% to 2% of the volume of concrete.
2. **For Columns**: 2% to 4% of the volume of concrete.
3. **For Slabs**: 0.8% to 1% of the volume of concrete.

For 1 cubic meter of concrete:
- Beams: 10 to 20 kg of steel
- Columns: 20 to 40 kg of steel
- Slabs: 8 to 10 kg of steel

These values can vary based on design specifications and local codes.
Ques:- What is your landscape?
Right Answer:
My landscape refers to the overall environment and context in which I work, including the projects I manage, the stakeholders involved, the resources available, and the challenges I face in project planning and execution.
Ques:- How much quantity of work we can get by rod benders per day
Asked In :-
Right Answer:
A rod bender can typically complete around 1 to 2 tons of work per day, depending on the complexity of the bends and the specific project requirements.
Ques:- Hod do u calculate cable size for underground laying and the factors effecting/influencing it??
Asked In :- lyondellbasell,
Right Answer:
To calculate cable size for underground laying, use the following steps:

1. **Determine Load Requirements**: Calculate the total load in kilowatts (kW) or amperes (A) that the cable will carry.
2. **Voltage Drop**: Calculate the acceptable voltage drop based on the length of the cable run and the load. Typically, a maximum of 3-5% voltage drop is acceptable.
3. **Cable Length**: Measure the total length of the cable run, including any bends or loops.
4. **Ambient Temperature**: Consider the temperature of the environment where the cable will be laid, as it affects the cable's current-carrying capacity.
5. **Soil Thermal Resistivity**: Assess the thermal resistivity of the soil, which influences heat dissipation from the cable.
6. **Cable Type**: Select the type of cable (e.g., XLPE, PVC) as different materials have different current ratings.
7. **Installation Method
Ques:- What are the characteristics of Control Valve
Asked In :-
Right Answer:
The characteristics of a control valve include:

1. **Flow Characteristics**: The relationship between the valve opening and the flow rate, typically categorized as linear, equal percentage, or quick opening.
2. **Rangeability**: The ratio of the maximum to minimum flow rates that the valve can control effectively.
3. **Cv (Flow Coefficient)**: A measure of the valve's capacity to allow fluid flow, indicating how much flow can pass through the valve at a given pressure drop.
4. **Actuator Type**: The mechanism that operates the valve, which can be pneumatic, electric, or hydraulic.
5. **Response Time**: The speed at which the valve can adjust to changes in control signals.
6. **Leakage Rate**: The amount of fluid that can pass through the valve when it is in the closed position.
7. **Body Design**: The construction and materials of the valve body, affecting durability and compatibility with different fluids.
8. **Temperature and Pressure
Ques:- What is the principale of vortex flow meter.
Asked In :-
Right Answer:
A vortex flow meter operates on the principle of vortex shedding, where fluid flowing past a bluff body creates alternating vortices downstream. The frequency of these vortices is proportional to the flow velocity, allowing the meter to measure the flow rate accurately.
Ques:- What is the advantage of Cathodic eathing system and what is the basic principle and how itis working, please explain clearly .
Right Answer:
The advantage of a cathodic earthing system is that it protects structures from corrosion by providing a low-resistance path for stray currents to flow into the ground. The basic principle involves using a sacrificial anode (usually made of zinc, magnesium, or aluminum) that corrodes instead of the protected metal structure. It works by ensuring that the potential of the metal structure is kept negative relative to the surrounding soil, preventing corrosion by redirecting the electrochemical reactions away from the structure.
Ques:- How much quantity of blocks, cement and sand is required to complete 1sq.m of CC Hollow blockwork. Size-16″x8″x8″. Also what is the cement sand ration commonly used?
Asked In :- elv,
Right Answer:
To complete 1 sq.m of CC hollow blockwork using 16"x8"x8" blocks, you will need approximately:

- Blocks: 12-13 blocks
- Cement: 0.1 m³ (about 100 kg)
- Sand: 0.2 m³ (about 200 kg)

The common cement-sand ratio used is 1:6.