Ques:- How much cement,sand,aggregate will use for 1 cum in ratio of 1:2:4.
Asked In :- plug power,
Right Answer:
For a concrete mix ratio of 1:2:4 (Cement:Sand:Aggregate) for 1 cubic meter (cum), you will need:

- Cement: 0.4 cubic meters
- Sand: 0.8 cubic meters
- Aggregate: 1.6 cubic meters
Ques:- Qty of cement,sand and aggregate (1:3:6) required for RCC Slab size 1000 x 500 x 100 mm
Asked In :-
Right Answer:
To calculate the quantity of cement, sand, and aggregate required for an RCC slab of size 1000 mm x 500 mm x 100 mm with a mix ratio of 1:3:6:

1. Calculate the volume of the slab:
Volume = Length x Width x Height = 1000 mm x 500 mm x 100 mm = 50,000,000 mm³ = 0.05 m³

2. Total parts in the mix = 1 + 3 + 6 = 10 parts

3. Calculate the quantities:
- Cement = (1/10) x 0.05 m³ = 0.005 m³
- Sand = (3/10) x 0.05 m³ = 0.015 m³
- Aggregate = (6/10) x 0.05 m³ = 0.03 m³

4. Convert to kg (assuming density of cement =
Ques:- Why we twist the cable in case of twisted pair cable?
Asked In :- pnr railworks, jsw cement, elv,
Right Answer:
Twisting the wires in a twisted pair cable helps to reduce electromagnetic interference and crosstalk between the pairs, improving signal quality and transmission performance.
Ques:- What is meant by camber
Asked In :-
Right Answer:
Camber refers to the slight upward curve or slope of a pipeline or road surface, designed to facilitate drainage and improve structural integrity.
Ques:- Distinguish between nominal and design mix?
Right Answer:
Nominal mix refers to a fixed proportion of ingredients (cement, sand, aggregate) used in concrete, typically based on standard ratios (like 1:2:4). Design mix, on the other hand, is a tailored mix designed based on specific project requirements, considering factors like strength, durability, and workability, and is determined through testing and calculations.
Ques:- Tell me something about common wealth games
Asked In :- Nucor,
Right Answer:
The Commonwealth Games is a multi-sport event held every four years, featuring athletes from the Commonwealth of Nations. It includes a variety of sports and promotes friendship and competition among member countries. The first Games took place in 1930, and they are often referred to as the "Friendly Games."
Ques:- How can we caliberate interface level troll
Asked In :-
Right Answer:
To calibrate an interface level troll, follow these steps:

1. **Prepare the Equipment**: Ensure the interface level troll is installed correctly and connected to the control system.

2. **Use Reference Standards**: Obtain a known reference liquid with a specific gravity that is different from the other liquid in the tank.

3. **Fill the Tank**: Fill the tank with the reference liquid to a known level.

4. **Adjust the Calibration**: Access the calibration settings on the interface level troll and adjust the output signal to match the known level of the reference liquid.

5. **Repeat for Accuracy**: Repeat the process with different levels of the reference liquid to ensure accuracy across the measuring range.

6. **Document the Calibration**: Record the calibration results and any adjustments made for future reference.

7. **Verify Functionality**: After calibration, verify the functionality by testing with actual interface levels in the tank.
Ques:- Residential buildings,mixing ofconcrete,structural,construction material,site handling.
Asked In :- Visa Steel Ltd, metrohm,
Right Answer:
When designing residential buildings, it's important to ensure proper mixing of concrete for structural integrity. Use high-quality construction materials and follow best practices for site handling to ensure safety and efficiency during the construction process.
Ques:- WHAT IS THE CALCULATION FOR FINDING CEMENT AND SAND FOR 10' * 12' AREA RATIO 1:6 THICKNESS 12 MM
Right Answer:
To calculate the amount of cement and sand for a 10' x 12' area with a ratio of 1:6 and a thickness of 12 mm:

1. Convert dimensions to meters:
- Area = 10' x 12' = 3.048 m x 3.658 m = 11.14 m²
- Thickness = 12 mm = 0.012 m

2. Calculate volume:
- Volume = Area x Thickness = 11.14 m² x 0.012 m = 0.13368 m³

3. Total parts in the mix = 1 (cement) + 6 (sand) = 7 parts.

4. Calculate volumes of cement and sand:
- Volume of cement = (1/7) x 0.13368 m³ = 0.0191 m³
- Volume of sand = (6/7) x 0.13368 m³
Ques:- What is the implications when 600 hp motor is started whenthe unit is running with Transformer of capacity 1500 KVAand DG set of 1000kva
Asked In :-
Ques:- How do you find the weight of rod per metre lenth ?
Asked In :- robert bosch,
Right Answer:
To find the weight of a rod per meter length, use the formula:

Weight per meter (kg/m) = (Cross-sectional area (m²) × Density (kg/m³)).

For a circular rod, the cross-sectional area can be calculated as:

Area = π × (Diameter/2)².

Multiply this area by the density of the material to get the weight per meter.
Ques:- How to find quantity of cement mortar?I want to know the req quantity of cement for plastering 300sft in final coat with 12 mm. Any math involved? Plz help
Right Answer:
To find the quantity of cement mortar required for plastering 300 square feet (sft) with a final coat thickness of 12 mm, follow these steps:

1. Convert the area from square feet to square meters:
[
300 , text{sft} = 300 times 0.092903 = 27.87 , text{m}^2
]

2. Calculate the volume of plaster required:
[
text{Volume} = text{Area} times text{Thickness} = 27.87 , text{m}^2 times 0.012 , text{m} = 0.3344 , text{m}^3
]

3. Assuming a typical mix ratio of 1:4 (cement:sand), the total parts = 1 + 4 = 5.

4. Calculate the volume of cement
Ques:- I saw one P&ID 6″ control valve has been connected with 8″ process line, and 2″ valve also connected in parallel with 6″ valve. why the 2″ valve connected in parallel, Is there any technical reason. please clarify. With Regards-Kittu
Asked In :-
Right Answer:
The 2" valve connected in parallel with the 6" control valve allows for better flow control and flexibility in the system. It can help manage lower flow rates more efficiently, provide redundancy, and ensure that the system can maintain operation even if one valve is closed or fails.


AmbitionBox Logo

What makes Takluu valuable for interview preparation?

1 Lakh+
Companies
6 Lakh+
Interview Questions
50K+
Job Profiles
20K+
Users