Find Interview Questions for Top Companies
Ques:- How to Install the Analog / IP?
Right Answer:
To install an Analog/IP camera, follow these steps:

1. **Choose the Location**: Select a suitable location for the camera with a clear view and access to power.

2. **Mount the Camera**: Use the provided mounting bracket to secure the camera to the wall or ceiling.

3. **Connect Power**: For analog cameras, connect the power adapter to the camera. For IP cameras, connect to a PoE switch or injector if supported.

4. **Connect Video Cable**: For analog cameras, connect the coaxial cable from the camera to the DVR. For IP cameras, connect an Ethernet cable to the network switch or router.

5. **Configure the Camera**: For IP cameras, access the camera's web interface using its IP address to configure settings like resolution and network settings.

6. **Test the Installation**: Power on the system and check the video feed on the DVR or monitoring software to ensure the camera is functioning correctly.

7. **Secure Connections**
Ques:- Windows Package
Asked In :-
Right Answer:
A Windows Package typically refers to a software package that contains all the necessary files and instructions needed to install a program on a Windows operating system. This can include executable files, libraries, configuration files, and installation scripts, often bundled in formats like .exe, .msi, or .appx.
Ques:- System Configuration
Asked In :-
Right Answer:
System configuration refers to the arrangement and settings of hardware and software components in a computer system to ensure optimal performance and compatibility.
Ques:- Difference between Windows XP, 7 Vista & 8?
Asked In :- scottish government,
Right Answer:
Windows XP: Released in 2001, known for its stability and user-friendly interface.

Windows Vista: Released in 2007, introduced a new graphical interface and improved security features but faced criticism for performance issues.

Windows 7: Released in 2009, built on Vista's foundation with improved performance, better user interface, and enhanced compatibility.

Windows 8: Released in 2012, introduced a new Start screen with tiles for touch devices, but received mixed reviews for its drastic interface changes.
Ques:- What is the density of cement?
Asked In :-
Right Answer:
The density of cement is approximately 1440 kg/m³.
Ques:- What is the time frame for joining?
Right Answer:
The time frame for joining is typically within two to four weeks, depending on the candidate's notice period and company requirements.


AmbitionBox Logo

What makes Takluu valuable for interview preparation?

1 Lakh+
Companies
6 Lakh+
Interview Questions
50K+
Job Profiles
20K+
Users