Find Interview Questions for Top Companies
Ques:- What is the working area of your department?
Asked In :-
Right Answer:
The working area of our department involves managing production processes, ensuring quality control, optimizing workflow, and coordinating with other departments to meet production targets efficiently.
Ques:- Fgdsfgdgfgdsfgdgfgdsfgdgfgdsfgdg
Asked In :- flour mills of nigeria,
Right Answer:
I'm sorry, but the question appears to be nonsensical or incomplete. Please provide a clear and specific question for me to answer.
Ques:- Accomudation
Asked In :- gep,
Right Answer:
Accommodation refers to the process of adjusting or adapting to new conditions or environments, often in the context of living arrangements or the ability to meet different needs or requirements.
Ques:- Motor induction
Asked In :-
Right Answer:
Motor induction refers to the process by which an electric motor generates torque and motion through electromagnetic induction. In an induction motor, alternating current in the stator windings creates a rotating magnetic field, which induces a current in the rotor, causing it to turn and produce mechanical power.
Ques:- Production Line
Asked In :- flour mills of nigeria,
Right Answer:
A production line is a set of sequential processes where raw materials are transformed into finished products efficiently, often using machinery and assembly techniques to maximize output and minimize costs.
Ques:- RCC mortar cunsumption?
Asked In :- L&W Construction, ola,
Right Answer:
RCC (Reinforced Cement Concrete) mortar consumption typically ranges from 0.5 to 1.0 cubic meters of mortar per cubic meter of concrete, depending on the mix design and application.
Ques:- General Building execution procedures?
Right Answer:
General building execution procedures include:

1. **Planning and Design**: Review architectural and engineering plans.
2. **Site Preparation**: Clear the site, set up temporary facilities, and establish site access.
3. **Foundation Work**: Excavate and pour foundations according to specifications.
4. **Structural Framework**: Erect the structural framework, including beams and columns.
5. **Enclosure**: Install walls, roofs, and windows to create a weather-tight structure.
6. **Utilities Installation**: Install plumbing, electrical, and HVAC systems.
7. **Interior Finishes**: Complete drywall, flooring, painting, and fixtures.
8. **Exterior Finishes**: Apply siding, roofing, and landscaping.
9. **Quality Control**: Conduct inspections and tests throughout the process.
10. **Final Inspection and Handover**: Ensure compliance with codes and regulations before handing over the building.
Ques:- Basics in telecom infrastructure?
Asked In :- osg corporation,
Right Answer:
Telecom infrastructure includes the physical and virtual components that enable communication services. Key elements are:

1. **Base Stations**: Towers and antennas that transmit and receive signals.
2. **Transmission Lines**: Fiber optic cables and microwave links that carry data.
3. **Switching Centers**: Facilities that route calls and data between users.
4. **Data Centers**: Locations that store and manage data and applications.
5. **Network Management Systems**: Tools for monitoring and controlling the network.
6. **End-user Devices**: Phones, modems, and routers that connect users to the network.
Ques:- What do you do in production department?
Asked In :- gep,
Right Answer:
In the production department, I oversee the manufacturing process, ensure efficient production schedules, maintain quality control, manage resources, and collaborate with teams to optimize operations and meet production targets.
Ques:- What is CL?
Right Answer:
CL stands for Command Language, which is used in IBM's OS/400 operating system to execute commands and manage system operations.
Ques:- How to reduce power consumption
Right Answer:
To reduce power consumption, you can implement the following strategies:

1. Use energy-efficient appliances and equipment.
2. Optimize production processes to minimize energy use.
3. Implement regular maintenance to ensure equipment operates efficiently.
4. Utilize renewable energy sources where possible.
5. Educate employees on energy-saving practices.
6. Monitor and analyze energy usage to identify areas for improvement.
7. Install energy management systems to track and control consumption.
Ques:- What is a machine?
Asked In :- flour mills of nigeria,
Right Answer:
A machine is a device that uses energy to perform a specific task or work, often by transforming or manipulating materials.
Ques:- How do you receive customers?
Asked In :- flour mills of nigeria,
Right Answer:
I receive customers by greeting them warmly, actively listening to their needs, and providing assistance or information to address their inquiries or concerns.
Ques:- What are type of gear box?
Right Answer:
There are several types of gearboxes, including:

1. **Manual Gearbox** - Requires driver input to change gears.
2. **Automatic Gearbox** - Changes gears automatically based on speed and load.
3. **Semi-Automatic Gearbox** - Combines manual and automatic features.
4. **CVT (Continuously Variable Transmission)** - Provides an infinite number of gear ratios.
5. **Dual-Clutch Gearbox** - Uses two clutches for faster gear changes.
6. **Planetary Gearbox** - Uses a set of gears arranged in a planetary configuration for compact design.
7. **Reduction Gearbox** - Reduces speed and increases torque.
8. **Overdrive Gearbox** - Allows for higher speeds with lower engine RPM.
Ques:- How will you manage back lock?
Asked In :-
Right Answer:
To manage backlog, prioritize tasks based on urgency and importance, break down larger tasks into smaller, manageable pieces, set clear deadlines, regularly review and adjust priorities, and communicate with the team to ensure alignment and accountability.


AmbitionBox Logo

What makes Takluu valuable for interview preparation?

1 Lakh+
Companies
6 Lakh+
Interview Questions
50K+
Job Profiles
20K+
Users