Find Interview Questions for Top Companies
Ques:- What is the QA/QC
Asked In :- Quality Kiosk, Lennox, hilti,
Right Answer:
QA stands for Quality Assurance, which focuses on ensuring that processes are followed to prevent defects. QC stands for Quality Control, which involves inspecting and testing the final product to identify defects.
Ques:- How many days we should curing for plastering,brickwork,concrete?
Asked In :- weir minerals,
Right Answer:
Curing for plastering should be done for at least 7 days, for brickwork at least 7 days, and for concrete at least 7 days, but ideally 28 days for optimal strength.
Ques:- Why we used bricks in brickbat coba? main roll of bricks ? how it function?
Right Answer:
Bricks are used in brickbat coba to provide a durable and stable surface for waterproofing and thermal insulation. The main role of bricks in this application is to create a sloped layer that facilitates drainage, preventing water accumulation. They function by allowing water to flow off the surface, reducing the risk of leaks and damage to the underlying structure.
Ques:- What is SHEAR WALL ? why and where it is provided.
Right Answer:
A shear wall is a structural element designed to resist lateral forces, such as those from wind or earthquakes. It is typically a vertical wall made of reinforced concrete or masonry and is provided in buildings to enhance stability and strength. Shear walls are commonly placed in locations where they can effectively counteract these forces, such as at the core of high-rise buildings or along the perimeter of structures.
Ques:- For rcc which condition will u adopt now
Right Answer:
For RCC (Reinforced Cement Concrete), I would adopt the following conditions:

1. Ensure proper mix design for the concrete.
2. Use quality materials (cement, aggregates, and water).
3. Maintain adequate curing to achieve desired strength.
4. Follow proper reinforcement placement and cover requirements.
5. Monitor environmental conditions during pouring and curing.
Ques:- How the load will be transfer from pile foundation to soil?
Asked In :- Haldor Topsoe, Skanska UK,
Right Answer:
The load from a pile foundation is transferred to the soil primarily through two mechanisms: end bearing and skin friction. In end bearing, the load is transmitted directly from the bottom of the pile to the underlying soil or rock. In skin friction, the load is distributed along the sides of the pile, where friction between the pile surface and the surrounding soil helps support the load.
Ques:- How burnability of cement raw material is calculated from its free lime determined at 1400,1450 and1500Co.and how burning index range is calculated.
Asked In :-
Right Answer:
Burnability of cement raw material is calculated by determining the free lime content after burning at temperatures of 1400°C, 1450°C, and 1500°C. The burning index is then calculated based on the amount of free lime present at these temperatures. A higher free lime content indicates a higher burnability. The burning index range is typically categorized as follows: low burnability (0-1%), medium burnability (1-3%), and high burnability (above 3%).
Ques:- What is the job goals life goals
Right Answer:
My job goals include continuously improving my skills in quality assurance and ensuring that all projects meet the highest standards of safety and performance. My life goals involve achieving a healthy work-life balance, contributing positively to my community, and pursuing personal growth through learning and experiences.
Ques:- What is mean by bulking of sand?
Asked In :-
Right Answer:
Bulking of sand refers to the increase in volume of sand when it is moist due to the presence of water, which causes the sand particles to separate and occupy more space.
Ques:- WHAT IS POINT OF CONTRAFLEXURE ?
Asked In :-
Right Answer:
The point of contraflexure is a location along a beam or structural element where the bending moment changes sign, meaning the curvature of the beam changes from concave to convex or vice versa.
Ques:- Why do u choose Testing as ur career?
Asked In :-
Right Answer:
I chose testing as my career because I enjoy ensuring quality and reliability in products. I find satisfaction in identifying issues and helping to improve systems, which ultimately contributes to better outcomes in construction and engineering projects.
Ques:- How do you describe yourself as a person?
Asked In :- smud, gnfc,
Right Answer:
I would describe myself as detail-oriented, analytical, and dedicated. I enjoy problem-solving and am committed to ensuring quality in my work. I am also a good communicator and a team player, always willing to collaborate and support my colleagues.
Ques:- Explain overhauling stopsfor backpull our pumps?
Asked In :-
Right Answer:
Overhauling stops for backpull-out pumps are designed to facilitate the maintenance and repair of the pump without removing the entire unit from the piping system. These stops allow the motor and pump assembly to be pulled out together, providing access to internal components for inspection, cleaning, or replacement while keeping the piping intact. This process minimizes downtime and simplifies maintenance.


A Quality Engineer in the Civil/Structural field is a highly specialized professional who plays a vital role in ensuring the safety, integrity, and longevity of all types of construction projects. From skyscrapers and bridges to dams and tunnels, their primary mission is to verify that all work is executed in strict adherence to engineering standards, design specifications, and relevant building codes. They are the guardians of a project’s quality, serving as a critical check and balance against potential defects and failures.

The responsibilities of this role are comprehensive and span the entire project lifecycle. During the planning phase, a Quality Engineer contributes to the development of a project’s Quality Assurance (QA) plan, which outlines the procedures and standards to be followed. Once construction begins, they shift into a Quality Control (QC) role, actively inspecting materials and workmanship on site. This includes everything from verifying the quality of incoming raw materials like concrete, steel, and rebar, to ensuring that construction processes—such as welding, foundation pouring, and structural erection—are performed correctly. They may also be responsible for conducting and overseeing various tests, like concrete compressive strength tests or soil compaction tests, to validate performance.

A key part of the job is meticulous documentation. The Quality Engineer is tasked with creating detailed inspection reports, non-conformance reports (NCRs) for any deviations, and a comprehensive paper trail that can be used for future audits or in the event of a dispute. They work closely with project managers, site supervisors, and contractors, often having the authority to halt work if a critical quality issue is identified. The position demands a strong understanding of civil engineering principles, a keen eye for detail, and excellent communication skills. Ultimately, the work of a Quality Engineer is indispensable, as it provides the assurance that a structure is not only functional but also safe, reliable, and built to stand the test of time.