Ques:- What is cutting clearance ?
Right Answer:
Cutting clearance is the space or gap between the cutting tool and the workpiece that allows for the removal of material without causing damage to the tool or the part being machined.
Ques:- What is CAPA?
Right Answer:
CAPA stands for Corrective and Preventive Action. It is a process used in quality management to identify, investigate, and resolve issues to prevent their recurrence and to improve processes.
Ques:- What material is used in class B clean room garment?
Right Answer:
Class B clean room garments are typically made from materials such as polyester, polypropylene, or a combination of these with additional treatments for static control and contamination prevention.
Ques:- What are the methods to reduce cutting force ?
Right Answer:
1. Use sharper cutting tools.
2. Optimize cutting speed and feed rate.
3. Select appropriate cutting fluid or coolant.
4. Use a suitable tool geometry.
5. Reduce tool wear through proper maintenance.
6. Implement vibration control techniques.
7. Minimize cutting depth when possible.
Ques:- What are the types of guide plate tool ?
Right Answer:
The types of guide plate tools include:

1. Fixed guide plates
2. Adjustable guide plates
3. Indexable guide plates
4. Multi-functional guide plates
Ques:- 1) Different methods of sterilization.
Right Answer:
1) Autoclaving (steam sterilization)
2) Dry heat sterilization
3) Chemical sterilization (e.g., ethylene oxide, hydrogen peroxide)
4) Radiation sterilization (e.g., gamma rays, UV light)
5) Filtration sterilization
6) Plasma sterilization
Ques:- What is QA Testing?
Right Answer:
QA Testing, or Quality Assurance Testing, is the process of evaluating a software product to ensure it meets specified requirements and is free of defects, ensuring its quality and reliability before release.
Ques:- What is an Inspection and test status?
Right Answer:
Inspection and test status refers to the current condition or progress of inspections and tests conducted on materials, components, or systems in a project. It indicates whether items have passed, failed, or are pending inspection or testing, helping to ensure quality control and compliance with specifications.
Ques:- What is cascade loop and how it work and why it used insteadof PID single loop?In cascade, Which loop is faster and slower?
Right Answer:
A cascade loop is a control system that uses two controllers: a primary (master) controller and a secondary (slave) controller. The primary controller sets the setpoint for the secondary controller, allowing for more precise control of a process. It is used instead of a single PID loop when the process has a fast dynamic response that needs tighter control, as it can reduce the effect of disturbances and improve stability.

In a cascade loop, the secondary (slave) loop is faster because it responds to changes more quickly, while the primary (master) loop is slower as it manages the overall process setpoint.
Ques:- R.O. Plant
Right Answer:
A Reverse Osmosis (R.O.) Plant is a water purification system that uses a semi-permeable membrane to remove impurities, salts, and contaminants from water by applying pressure, allowing only water molecules to pass through while blocking larger molecules and ions.
Ques:- Calculation of shuttering material
Right Answer:
To calculate the shuttering material, follow these steps:

1. **Determine the dimensions** of the area to be shuttered (length, width, height).
2. **Calculate the total surface area** to be covered by the shuttering:
- For walls: Area = Height × Length (for each wall)
- For slabs: Area = Length × Width
3. **Add the areas** of all surfaces to get the total surface area.
4. **Account for the type of material** used (plywood, metal, etc.) and its thickness.
5. **Calculate the quantity** of shuttering material required based on the total surface area and the dimensions of the individual shuttering panels.

Make sure to include a waste factor (typically 10-15%) to account for cuts and defects.
Ques:- How to prepare cube of concrete
Right Answer:
To prepare a concrete cube, follow these steps:

1. **Materials**: Gather cement, sand, gravel (or crushed stone), and water.
2. **Mixing**: Use a concrete mixer or a mixing tray to combine the materials in the ratio of 1 part cement, 2 parts sand, and 3 parts gravel. Add water gradually until the mixture is workable but not too wet.
3. **Molding**: Pour the mixed concrete into a cube mold (typically 150mm x 150mm x 150mm) and ensure it fills all corners.
4. **Compacting**: Use a tamper or a vibrating table to compact the concrete and remove air bubbles.
5. **Curing**: Cover the mold with a plastic sheet or wet burlap to retain moisture and allow it to cure for at least 24 hours.
6. **Demolding**: After 24 hours, remove the cube from the mold and place it in a curing environment
Ques:- How will you (as manager) not let your team member leave the company while he’s only there for hike, and your senior management has decided to follow strict budget?
Right Answer:
To retain the team member, I would have an open and honest conversation to understand their motivations and concerns. I would highlight their value to the team, discuss potential career growth opportunities, and explore non-monetary incentives such as professional development, flexible work arrangements, or additional responsibilities that align with their interests. Additionally, I would advocate for their contributions to senior management to seek possible budget adjustments or future salary reviews.
Ques:- The ?Tungabhadra Project? is a joint venture of thegovernments of: (a) Madhya Pradesh and Rajasthan (b) Maharashtra and Andhra Pradesh (c) Karnataka and Tamil Nadu (d) Karnataka and Andhra Pradesh
Right Answer:
(d) Karnataka and Andhra Pradesh
Ques:- Software Life Cycle Model
Right Answer:
The Software Life Cycle Model refers to the structured process of developing software, which typically includes stages such as requirements gathering, design, implementation, testing, deployment, and maintenance. Common models include Waterfall, Agile, Spiral, and V-Model, each with its own approach to managing these stages.
Ques:- What is the difference between development length & overlap length ?
Right Answer:
Development length is the length of rebar required to be embedded in concrete to develop its full strength, while overlap length is the length of rebar that is overlapped and tied together to ensure continuity in reinforcement when two bars are joined.
Ques:- Explain project life cycle?
Right Answer:
The project life cycle consists of five main phases:

1. **Initiation**: Defining the project and obtaining approval.
2. **Planning**: Outlining the project scope, objectives, and creating a roadmap.
3. **Execution**: Implementing the project plan and delivering the project outputs.
4. **Monitoring and Controlling**: Tracking progress and making adjustments as needed.
5. **Closure**: Finalizing all activities, delivering the final product, and closing the project.