Ques:- How does AUTOSAR support reusability and scalability
Right Answer:
AUTOSAR supports reusability and scalability through its standardized architecture, which allows software components to be developed independently and reused across different projects. It defines clear interfaces and communication protocols, enabling components to be easily integrated. Additionally, the layered architecture separates application software from hardware, allowing for scalability as new features or hardware platforms can be added without significant changes to existing components.
Ques:- What’s your experience with integrating AEM with Adobe Marketing Cloud or Adobe Analytics
Right Answer:
I have experience integrating AEM with Adobe Marketing Cloud and Adobe Analytics by using the AEM Adobe Analytics Cloud Service. This involves configuring the Adobe Analytics settings in AEM, setting up tracking for page views and events, and utilizing the Experience Cloud ID service for user tracking. I also implement data layer specifications to ensure accurate data collection and reporting.
Ques:- What is AUTOSAR and why is it used in automotive software
Right Answer:
AUTOSAR (AUTomotive Open System ARchitecture) is a standardized software architecture for automotive systems that enables the development of scalable, reusable, and interoperable software components. It is used in automotive software to improve collaboration among manufacturers and suppliers, enhance software quality, and reduce development costs and time.
Ques:- What is the difference between compiled and interpreted languages
Right Answer:
Compiled languages are converted into machine code by a compiler before execution, resulting in faster performance. Interpreted languages are executed line-by-line by an interpreter at runtime, which can lead to slower performance.
Ques:- How do you handle errors and exceptions in ABAP
Right Answer:
In ABAP, errors and exceptions can be handled using the TRY...ENDTRY block along with CATCH for specific exceptions. You can also use the MESSAGE statement to raise messages for errors. Additionally, the SY-SUBRC system variable can be checked after function calls to determine if an error occurred.
Ques:- Given an array of distinct positive numbers find the maximum sum of elements such that no 2 elements occurring in the maximum sum set is adjacent to each other
Asked In :- pinnacle, fieldassist,
Ques:- Basics of JavaScript. Promise and observables. Pipe in angular , Life Cycle hook of angular, DI in angular, and some basics regarding that, Closure
Asked In :- western digital, pinnacle,
Right Answer:
1. **Promise**: A Promise is an object representing the eventual completion or failure of an asynchronous operation. It can be in one of three states: pending, fulfilled, or rejected.

2. **Observables**: Observables are a part of the RxJS library and represent a stream of data that can be observed over time. They can emit multiple values and are more powerful than Promises, as they support operators for transforming and combining streams.

3. **Pipe in Angular**: The `pipe` method in Angular is used to compose multiple operators to transform data in Observables. It allows chaining of operators for better readability and functionality.

4. **Life Cycle Hooks in Angular**: Angular provides several lifecycle hooks that allow you to tap into key events in a component's lifecycle, such as `ngOnInit`, `ngOnChanges`, `ngOnDestroy`, etc., to perform actions at specific points.

5. **Dependency Injection (DI) in Angular**: DI is a
Ques:- I was called for Oracle APEX developer role. So I am supposed to expose my Oracle APEX experience first of all.
Asked In :- absa bank, pinnacle,
Right Answer:
I have experience in Oracle APEX by developing web applications using its low-code platform, creating interactive reports, forms, and dashboards, and utilizing SQL and PL/SQL for backend processes. I am familiar with APEX components like regions, processes, and validations, and I have implemented security features and responsive designs in my applications.
Ques:- How to find a loop in linked list
Asked In :- pinnacle,
Right Answer:
To find a loop in a linked list, use Floyd's Cycle Detection Algorithm (Tortoise and Hare). Initialize two pointers, one moving at normal speed (slow) and the other moving at double speed (fast). Traverse the list; if there is a loop, the fast pointer will eventually meet the slow pointer. If the fast pointer reaches the end of the list (null), there is no loop.
Ques:- Briefly describe yourself?
Right Answer:
I am a dedicated project manager with over [X years] of experience in leading diverse teams and managing projects from initiation to completion. I excel in communication, problem-solving, and ensuring projects are delivered on time and within budget. My background includes [specific industries or types of projects], and I am passionate about driving team collaboration and achieving project goals.
Ques:- Why do we have two types of scheduling options in Primavera – Retained logic and progress override? What is the difference between the two and when is either one selected?
Right Answer:
In Primavera, we have two types of scheduling options: Retained Logic and Progress Override.

- **Retained Logic** maintains the original relationships and dependencies between tasks, ensuring that the schedule reflects the planned sequence of work. It is selected when you want to keep the integrity of the project plan intact.

- **Progress Override** allows for adjustments to the schedule based on actual progress, which can change the relationships between tasks. It is selected when you need to reflect real-time updates and changes in task completion that may affect the overall schedule.

Use Retained Logic for accurate planning and Progress Override for flexibility in managing ongoing project changes.
Ques:- What are the types of risks you may encounter in a project?
Right Answer:
1. **Technical Risks** - Issues related to technology and technical feasibility.
2. **Financial Risks** - Budget overruns or funding shortages.
3. **Schedule Risks** - Delays in project timelines.
4. **Scope Risks** - Changes in project scope or requirements.
5. **Resource Risks** - Availability and allocation of resources.
6. **Quality Risks** - Failure to meet quality standards.
7. **Stakeholder Risks** - Conflicts or changes in stakeholder expectations.
8. **External Risks** - Factors outside the project’s control, like regulatory changes or market conditions.
Ques:- What are new technologies in civil engr. that can reduce construction cost?
Right Answer:
New technologies in civil engineering that can reduce construction costs include:

1. Building Information Modeling (BIM)
2. Prefabrication and Modular Construction
3. 3D Printing
4. Drones for surveying and monitoring
5. Advanced materials (e.g., self-healing concrete, high-strength steel)
6. Sustainable construction practices (e.g., green materials, energy-efficient designs)
7. Automation and robotics in construction processes
8. Internet of Things (IoT) for real-time project management and monitoring.
Ques:- PLANNING AND BUDGETING
Right Answer:
Effective planning and budgeting in construction involves defining project scope, estimating costs, allocating resources, creating a timeline, and regularly monitoring progress against the budget to ensure financial control and project success.
Ques:- What is the difference between a user story, a task, and an epic in Agile
Right Answer:
* **Epic:** A large, high-level user story that is too big to complete in a single iteration. It's usually broken down into smaller user stories.
* **User Story:** A small, self-contained requirement that represents a valuable piece of functionality for the end-user. It follows the format: "As a [user type], I want [goal] so that [benefit]".
* **Task:** A small, actionable item that needs to be done to complete a user story. It's a technical breakdown of the work required by the development team.
Ques:- Can you describe a time when an Agile project didn’t go as planned and how you handled it
Right Answer:
"In one project, we underestimated the complexity of integrating a new third-party API. This caused us to miss our sprint goal. To address this, we immediately re-estimated the remaining work, broke down the integration into smaller, more manageable tasks, and increased communication with the API vendor. We also temporarily shifted team focus to prioritize the integration, delaying a lower-priority feature for the next sprint. Finally, in the sprint retrospective, we implemented a better vetting process for third-party integrations to avoid similar issues in the future."
Ques:- How do you approach Agile at scale (e.g., SAFe, LeSS) for larger teams or organizations
Right Answer:
I would assess the organization's context, choose a suitable scaling framework like SAFe or LeSS based on needs, implement it incrementally with training and coaching, focusing on value delivery, and continuously inspect and adapt the implementation based on feedback and results.
Ques:- What is the difference between Kanban and Scrum, and when would you use each
Right Answer:
Kanban focuses on visualizing workflow, limiting work in progress (WIP), and continuous flow. Scrum uses time-boxed iterations (sprints) with specific roles (Scrum Master, Product Owner, Development Team) and events (sprint planning, daily scrum, sprint review, sprint retrospective).

Use Kanban when you need continuous delivery, have evolving priorities, and want to improve workflow incrementally. Use Scrum when you need structured development with fixed-length iterations, have clear goals for each iteration, and benefit from team collaboration with defined roles.
Ques:- What are Agile ceremonies (like sprint planning, daily stand-ups, sprint reviews, retrospectives), and how do they work
Right Answer:
Agile ceremonies are recurring meetings within a sprint to facilitate communication, planning, and continuous improvement.

* **Sprint Planning:** The team decides what work to complete in the upcoming sprint. They discuss user stories, estimate effort, and define the sprint goal.

* **Daily Stand-up:** A brief daily meeting where the team shares progress, identifies roadblocks, and coordinates efforts. Each member typically answers: What did I do yesterday? What will I do today? Are there any impediments?

* **Sprint Review:** The team demonstrates the completed work to stakeholders, gathering feedback and ensuring alignment with expectations.

* **Sprint Retrospective:** The team reflects on the past sprint, identifying what went well, what could be improved, and defining action items to enhance future performance.