Find Interview Questions for Top Companies
Rtu Interview Questions and Answers
Ques:- Reconciliation of material
Right Answer:
Reconciliation of material involves comparing the quantities of materials received, used, and remaining in inventory to ensure accuracy in records and identify any discrepancies. This process typically includes tracking material from procurement through production to final usage, ensuring that all inputs and outputs are accounted for correctly.
Ques:- My experiences in sites at previous company
Right Answer:
In my previous company, I worked on various sites where I was responsible for installing, calibrating, and maintaining instrumentation and electronic systems. I collaborated with cross-functional teams to ensure compliance with safety standards and project specifications. I also conducted troubleshooting and provided technical support to resolve issues efficiently.
Ques:- What are the basic instructions used in simatic s7-300 plc?
Right Answer:
The basic instructions used in the Siemens S7-300 PLC include:

1. **Logical Instructions**: AND, OR, NOT
2. **Arithmetic Instructions**: ADD, SUB, MUL, DIV
3. **Data Handling Instructions**: MOVE, TRANSFER
4. **Comparison Instructions**: EQ (equal), NE (not equal), GT (greater than), LT (less than)
5. **Control Instructions**: SET, RESET, JUMP, CALL
6. **Timer Instructions**: TON (on-delay timer), TOF (off-delay timer), TP (pulse timer)
7. **Counter Instructions**: CTU (count up), CTD (count down)

These instructions are fundamental for programming and controlling processes in the S7-300 PLC.
Ques:- What is cascade loop and how it work and why it used insteadof PID single loop?In cascade, Which loop is faster and slower?
Right Answer:
A cascade loop is a control system that uses two controllers: a primary (master) controller and a secondary (slave) controller. The primary controller sets the setpoint for the secondary controller, allowing for more precise control of a process. It is used instead of a single PID loop when the process has a fast dynamic response that needs tighter control, as it can reduce the effect of disturbances and improve stability.

In a cascade loop, the secondary (slave) loop is faster because it responds to changes more quickly, while the primary (master) loop is slower as it manages the overall process setpoint.
Ques:- R.O. Plant
Right Answer:
A Reverse Osmosis (R.O.) Plant is a water purification system that uses a semi-permeable membrane to remove impurities, salts, and contaminants from water by applying pressure, allowing only water molecules to pass through while blocking larger molecules and ions.
AmbitionBox Logo

What makes Takluu valuable for interview preparation?

1 Lakh+
Companies
6 Lakh+
Interview Questions
50K+
Job Profiles
20K+
Users