Find Interview Questions for Top Companies
Te connectivity Interview Questions and Answers
Ques:- What is the difference between object and class?
Right Answer:
A class is a blueprint or template that defines the properties and behaviors (methods) of objects. An object is an instance of a class that contains actual values and can perform the behaviors defined by the class.
Ques:- Why do you think this company is better than your current company?
Right Answer:
I believe this company offers more opportunities for growth and innovation, aligns better with my career goals, and has a strong reputation for valuing employee development and collaboration.
Ques:- What is black box testing?
Right Answer:
Black box testing is a software testing method where the tester evaluates the functionality of an application without knowing its internal code or structure. The focus is on input and output, ensuring the software behaves as expected based on requirements.
Ques:- What is cascade loop and how it work and why it used insteadof PID single loop?In cascade, Which loop is faster and slower?
Right Answer:
A cascade loop is a control system that uses two controllers: a primary (master) controller and a secondary (slave) controller. The primary controller sets the setpoint for the secondary controller, allowing for more precise control of a process. It is used instead of a single PID loop when the process has a fast dynamic response that needs tighter control, as it can reduce the effect of disturbances and improve stability.

In a cascade loop, the secondary (slave) loop is faster because it responds to changes more quickly, while the primary (master) loop is slower as it manages the overall process setpoint.
Ques:- Calculation of shuttering material
Right Answer:
To calculate the shuttering material, follow these steps:

1. **Determine the dimensions** of the area to be shuttered (length, width, height).
2. **Calculate the total surface area** to be covered by the shuttering:
- For walls: Area = Height × Length (for each wall)
- For slabs: Area = Length × Width
3. **Add the areas** of all surfaces to get the total surface area.
4. **Account for the type of material** used (plywood, metal, etc.) and its thickness.
5. **Calculate the quantity** of shuttering material required based on the total surface area and the dimensions of the individual shuttering panels.

Make sure to include a waste factor (typically 10-15%) to account for cuts and defects.
Ques:- Details of RMC Batching Slip
Right Answer:
A RMC (Ready Mixed Concrete) Batching Slip is a document that provides details about the concrete mix being delivered. It typically includes information such as the batch number, date and time of batching, type of concrete mix, quantities of materials used (cement, aggregates, water, additives), the total volume of concrete, and the delivery location. This slip ensures that the correct mix is produced and delivered according to specifications.
Ques:- Reconciliation of material
Right Answer:
Reconciliation of material involves comparing the quantities of materials received, used, and remaining in inventory to ensure accuracy in records and identify any discrepancies. This process typically includes tracking material from procurement through production to final usage, ensuring that all inputs and outputs are accounted for correctly.
AmbitionBox Logo

What makes Takluu valuable for interview preparation?

1 Lakh+
Companies
6 Lakh+
Interview Questions
50K+
Job Profiles
20K+
Users