Uniper Interview Questions and Answers
Ques:- Do you understand milestones, interdependencies, Resource allocation?
Right Answer:
Yes, I understand milestones as key points in a project timeline that signify important achievements. Interdependencies refer to the relationships between tasks where one task relies on the completion of another. Resource allocation involves assigning available resources, such as time, budget, and personnel, to various tasks to ensure project success.
Ques:- Explain plan baselines?
Right Answer:
Plan baselines are a feature in database management systems that allow you to store and manage execution plans for SQL queries. They help ensure that the database uses a consistent and optimal execution plan for a query, even if the underlying data or statistics change. This can improve performance and stability by preventing unexpected plan changes that could lead to slower query execution.
Ques:- How do you monitor risks to the project and mitigate them?
Right Answer:
I monitor risks by regularly reviewing the risk register, conducting risk assessments, and holding team meetings to discuss potential issues. To mitigate risks, I develop response plans, prioritize risks based on their impact and likelihood, and implement strategies such as avoidance, transfer, acceptance, or mitigation. I also track the effectiveness of these strategies and adjust them as necessary throughout the project lifecycle.
Ques:- Tell the difference between Physical inventory and Cycle counting and which process is better ? and why?
Right Answer:
Physical inventory involves counting all inventory items at once, usually at the end of a financial period, while cycle counting is a method of counting a subset of inventory on a regular basis throughout the year. Cycle counting is generally considered better because it allows for more frequent accuracy checks, minimizes disruption to operations, and helps identify discrepancies in real-time.
Ques:- What is Bill Of material what information it contains?
Right Answer:
A Bill of Materials (BOM) is a comprehensive list of all the materials, components, and assemblies required to manufacture a product. It typically contains information such as part numbers, descriptions, quantities, units of measure, and the hierarchy of components.
Ques:- Explain the Vendor rating process?
Right Answer:
The vendor rating process involves evaluating and scoring suppliers based on specific criteria such as quality, delivery performance, pricing, and service. This typically includes the following steps:

1. **Define Criteria**: Establish the metrics for evaluation (e.g., quality, delivery time, cost, responsiveness).
2. **Data Collection**: Gather data on vendor performance through reports, feedback, and audits.
3. **Scoring**: Assign scores to vendors based on their performance against the defined criteria.
4. **Analysis**: Analyze the scores to identify strengths and weaknesses of each vendor.
5. **Feedback**: Provide feedback to vendors regarding their performance.
6. **Action Plan**: Develop improvement plans for underperforming vendors and recognize top performers.
7. **Review and Update**: Regularly review and update the rating process to ensure it remains relevant and effective.
Ques:- Sharp Analytical Skills
Right Answer:
Sharp analytical skills in supply chain management involve the ability to assess data, identify trends, solve problems, and make informed decisions to optimize processes and improve efficiency.
Ques:- What are the GL postings in procure to pay cycle?
Right Answer:
The GL postings in the procure-to-pay cycle typically include:

1. **Purchase Order Creation**: No GL impact at this stage.
2. **Goods Receipt**: Debit Inventory/Expense account, Credit Goods Receipt/Inventory account.
3. **Invoice Receipt**: Debit Expense/Inventory account, Credit Accounts Payable.
4. **Payment Processing**: Debit Accounts Payable, Credit Cash/Bank account.
Ques:- A bag contains 6 black and 8 white balls. One ball is drawn at random. What is the probability that the ball drawn is white?
Right Answer:
The probability that the ball drawn is white is 8/14 or 4/7.
Ques:- What is the best way to simulate the real behavior of a web based system?
Right Answer:
The best way to simulate the real behavior of a web-based system is to use automated testing tools that can mimic user interactions, such as Selenium or Cypress, along with performance testing tools like JMeter to assess load handling. Additionally, incorporating real user feedback and using staging environments that replicate production settings can enhance the simulation.
Ques:- What is the formula to calculate machine and process capability?
Right Answer:
The formula to calculate machine capability (Cp) is:

Cp = (USL - LSL) / (6 * σ)

And for process capability (Cpk):

Cpk = min[(USL - μ) / (3 * σ), (μ - LSL) / (3 * σ)]

Where:
- USL = Upper Specification Limit
- LSL = Lower Specification Limit
- μ = Mean of the process
- σ = Standard deviation of the process
Ques:- How to prepare cube of concrete
Right Answer:
To prepare a concrete cube, follow these steps:

1. **Materials**: Gather cement, sand, gravel (or crushed stone), and water.
2. **Mixing**: Use a concrete mixer or a mixing tray to combine the materials in the ratio of 1 part cement, 2 parts sand, and 3 parts gravel. Add water gradually until the mixture is workable but not too wet.
3. **Molding**: Pour the mixed concrete into a cube mold (typically 150mm x 150mm x 150mm) and ensure it fills all corners.
4. **Compacting**: Use a tamper or a vibrating table to compact the concrete and remove air bubbles.
5. **Curing**: Cover the mold with a plastic sheet or wet burlap to retain moisture and allow it to cure for at least 24 hours.
6. **Demolding**: After 24 hours, remove the cube from the mold and place it in a curing environment
Ques:- Details of RMC Batching Slip
Right Answer:
A RMC (Ready Mixed Concrete) Batching Slip is a document that provides details about the concrete mix being delivered. It typically includes information such as the batch number, date and time of batching, type of concrete mix, quantities of materials used (cement, aggregates, water, additives), the total volume of concrete, and the delivery location. This slip ensures that the correct mix is produced and delivered according to specifications.
Ques:- Calculation of shuttering material
Right Answer:
To calculate the shuttering material, follow these steps:

1. **Determine the dimensions** of the area to be shuttered (length, width, height).
2. **Calculate the total surface area** to be covered by the shuttering:
- For walls: Area = Height × Length (for each wall)
- For slabs: Area = Length × Width
3. **Add the areas** of all surfaces to get the total surface area.
4. **Account for the type of material** used (plywood, metal, etc.) and its thickness.
5. **Calculate the quantity** of shuttering material required based on the total surface area and the dimensions of the individual shuttering panels.

Make sure to include a waste factor (typically 10-15%) to account for cuts and defects.
Ques:- Explain Your Project That You Have Done In Last Year?
Right Answer:
In the last year, I worked on a project focused on optimizing a chemical production process. We analyzed the existing workflow, identified bottlenecks, and implemented process improvements that reduced cycle time by 20%. We also introduced a new quality control system that decreased defects by 15%. The project involved collaboration with cross-functional teams and resulted in a significant increase in overall efficiency and product quality.