Ques:- Suitable condition of dam site
Right Answer:
A suitable condition for a dam site includes stable geological formations, adequate water supply, sufficient distance from populated areas, minimal seismic activity, and good access for construction and maintenance.
Ques:- How do you determine realistic schedules for the project?
Right Answer:
To determine realistic schedules for a project, I follow these steps:

1. Define project scope and deliverables.
2. Break down tasks into smaller, manageable components (Work Breakdown Structure).
3. Estimate the time required for each task using historical data and expert input.
4. Identify dependencies between tasks to understand the sequence of work.
5. Consider resource availability and constraints.
6. Use project management tools to create a timeline and visualize the schedule.
7. Review and adjust the schedule based on team feedback and potential risks.
8. Monitor progress regularly and be flexible to make adjustments as needed.
Ques:- What are processes and process groups?
Right Answer:
Processes are a series of actions or steps taken to achieve a specific goal in project management. Process groups are categories that organize these processes into five main areas: Initiating, Planning, Executing, Monitoring and Controlling, and Closing.
Ques:- Differentiate PLC,DCS,SCADA?
Right Answer:
PLC (Programmable Logic Controller) is used for controlling machinery and processes with real-time operations. DCS (Distributed Control System) is used for controlling complex processes in large plants, providing centralized control with distributed elements. SCADA (Supervisory Control and Data Acquisition) is used for monitoring and controlling infrastructure and facility-based processes, often over large distances, providing data collection and visualization.
Ques:- What is RPI and NUT in controlnet networx. what happen if we are increase the NUT of controlnet networx?
Right Answer:
RPI (Requested Packet Interval) is the time interval at which a device sends data on a ControlNet network, while NUT (Network Update Time) is the maximum time allowed for the network to update all devices. If you increase the NUT, it can lead to longer delays in data updates across the network, potentially affecting real-time performance and responsiveness.
Ques:- What do you mean by a prototype? Define analysis prototype
Right Answer:
A prototype is an early model or sample of a product used to test and validate ideas before full-scale development. An analysis prototype is a preliminary version of a system created to explore and clarify requirements, allowing stakeholders to visualize and refine their needs before finalizing the design.
Ques:- The system runs at Intranet environment and it has a security system. The security system's architecture designed on User and Role system. There are only one system Role and that is System Amdin Role and user can also create as many role as he needs.
Right Answer:
The security system allows for a single predefined role (System Admin) while enabling users to create multiple custom roles as needed for their specific requirements.
Ques:- A man works on the 10th floor and takes the elevator down to ground level at the end of the day. Yet every morning, he only takes the elevator to the 7th floor, even when in a hurry. But he goes all the way to the 10th floor when others are in the elevator with him or it is a rainy day. Why?
Right Answer:
The man is short and can only reach the button for the 7th floor. He can reach the button for the 10th floor when others are with him or when it's rainy and he uses an umbrella to press it.
Ques:- What would you do if you were the one survivor in an earthquake?
Right Answer:
I would assess my surroundings for safety, check for injuries, find a safe location, signal for help, and gather supplies if possible.
Ques:- Please estimate the total revenue of [a particular juice brand] from the Swedish market who has a 10% market share. You have 5 minutes?
Right Answer:
To estimate the total revenue of the juice brand in the Swedish market, you need to know the total market size for juice in Sweden. If we assume the total market size is, for example, 1 billion SEK, then with a 10% market share, the revenue would be 100 million SEK. Please replace the market size with the actual figure if known.
Ques:- Describe a situation that required you to do a number of things at the same time. How did you handle it? What was the result?
Right Answer:
In my previous job, I had to manage multiple projects with tight deadlines. I created a prioritized to-do list, allocated specific time blocks for each task, and used project management tools to track progress. I communicated regularly with my team to delegate tasks and ensure everyone was aligned. As a result, we completed all projects on time, and the quality of work exceeded client expectations.
Ques:- A French soft drink company, Le Seine, is looking to diversify its holdings by investing in a new fast food chain in the US. You are hired to determine whether they should pursue this path and, if so, how they should go about execution.
Right Answer:
Le Seine should conduct market research to assess demand for a new fast food chain in the US, analyze competitors, and identify target demographics. If the market shows potential, they should develop a unique value proposition, create a solid business plan, and consider partnerships with local franchises or experienced operators. Finally, they should focus on marketing strategies that resonate with American consumers while maintaining their French identity.
AmbitionBox Logo

What makes Takluu valuable for interview preparation?

1 Lakh+
Companies
6 Lakh+
Interview Questions
50K+
Job Profiles
20K+
Users